The Piledriver and Bridgeworker Program is designed to teach a student how to construct, install, repair or remove all types of deep piles and caisson foundations and other types of marine installations: such as bridges, docks, wharves, tunnels and bulkheads.
The Piledriver and Bridgeworker Program can usually be completed within a 3 year time frame. Approx. 20 weeks of the program are designated for in-class study. After graduation, the Piledriver and Bridgeworker will be expected to be well versed in fitting, welding, rigging, form-work and timber / concrete construction, seamanship, heavy-duty equipment operation, and environmentally safe practices.
|
Pile-Driver Operators Wage: $53,000 10 Year Growth Rate: 8.3% Self Employed: 5.0% Unemployment Rate: 14.3% Employed Part Time: 4.6% Education Requirements: Moderate-term on-the-job training |